Over the last few days, the genba (build site) has been busy with electricians, plumbers and carpenters. As you can see by the following pictures, the electrical was finalized, some plumbing was installed and the main staircase (frame and most of the steps) were installed. Exciting times!!
(above) kitchen system. (below) 2nd floor toilet sink.

(above) 1st floor "senmen" sink that will be in the utility room with the boiler, washing machine and etc. (below) the staircase (frame and most of the steps).


Over the next few days, the radiant floor heating will go in the 1st floor, concrete will then be laid over it and the 2nd floor (correct color this time) flooring will be intalled, as well. Busy, busy, busy.....